Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 200 Bailey Bridge / Compact 200 / Bailey Bridge (CB-200, 39.624m Long, 18-rows, Deck-type, Single-lane, Clear Width: 6m) at Baihetan Hydropower Station, Qiaojia County, Sichuan Province

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Bailey Bridge (CB-200, 39.624m Long, 18-rows, Deck-type, Single-lane, Clear Width: 6m) at Baihetan Hydropower Station, Qiaojia County, Sichuan Province

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • Compact 200

  • BAILEY

Project Showcase: 

A 120-Ton Heavy-Duty Access Bridge for a Wind Farm Project

Liaoning in Bridge

Liaoning in Bridge

Liaoning in Bridge


Project Vitals:

Application: Critical access bridge for heavy wind turbine components

Location: Ping'anpu Wind Farm, Tieling City, Liaoning Province, China

Span Length: 24 meters (79 feet)

Configuration: Deck-Type, 8-Row, Single-Layer

Application: Extreme Heavy-Load, Semi-Permanent Construction Bridge


An Engineered Solution for the Renewable Energy Sector:

This project provided a vital transportation link for the construction of a major wind farm in Liaoning Province. The primary challenge was to create an access route capable of supporting the immense weight of wind turbine components—such as nacelles, tower sections, and blades—which far exceed the capacity of standard temporary bridges.

Technical Highlights & A Custom-Engineered Design:

Extreme 120-Ton Load Capacity: To handle the massive 120-ton weight of specialized transport vehicles, a custom deck-type, 8-row, single-layer configuration was engineered。 In this robust design, eight parallel lines of Type 321 trusses are arrayed side-by-side directly beneath the roadway, creating a high-density foundation for the 24-meter span.


Steel Pipe Pile Foundations for Soft Soil: The superstructure is supported by a substructure of 630mm diameter spiral steel pipe piers。 This foundation type is ideal for rapid installation in the soft soil conditions commonly found at wind farm sites, providing a deep and stable footing for the heavy loads above.


Wide Carriageway and Heavy-Duty Deck: The bridge features a 6-meter wide carriageway to accommodate oversized transport vehicles。 The surface is composed of specialized heavy-duty deck panels with a maintenance-free design, built to withstand the intense, repeated stress of construction traffic.


A Benchmark for Renewable Energy Infrastructure:

The Liaoning wind farm bridge project highlights the critical role our modular systems can play in the renewable energy sector. It demonstrates our ability to rapidly deliver custom, ultra-high-strength access solutions that solve the unique logistical challenges of wind and solar farm construction, making us a trusted partner in the development of green energy.


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy