Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 200 Bailey Bridge / Compact 200 / modular temporary bridge steel bridge structures

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

modular temporary bridge steel bridge structures

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • Compact 200

  • BAILEY

                            type-200 bailey bridges 

  our company specializes in manufacturing, researching and developing bailey bridge parts.    

                                   Core Advantages

                                               --------------------------------------▶▶▶--------------------------------------

6

Careful selection of materials

5

Rigorous Craftsmanship

3

Quality Assurance

1

Integrity management

4

Technical team

2

After-sales service

                                            Product Description

                                          --------------------------------------▶▶▶--------------------------------------

Product Details  

Standard:                        ASTM, BS, GB                                                                                                        Product name:     Bailey steel bridge

Place of Origin:              Jiangsu, China                                                                                                       Brand:                   Jiangsu Bailey

Steel material grade:    Q355B                                                                                                                    Type:                     Heavy

Units of measurement: Piece                                                                                                                      Tolerance:             ±3%

supply Ability:               10000.0 Ton/Tons per Year

Is customization OK:    OK

Port of Loading:            Any port of China, main port is Shanghai port


                                                            Bridge Parts Display

                                   --------------------------------------▶▶▶--------------------------------------

1_02


ZB200 truss press limited table


structure form
No internal force not reinforced model reinforced model


SS
DS TS QS SSR
DSR TSR
QSR
200

standard truss

moment(kN.m)

1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200

standard truss

shear (kN)

222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201

high bending truss

moment(kN.m)

1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202

high bending truss

shear(kN)

348 696 1044
1392
348 696 1044
1392
203

Shear force of super

high shear truss(kN)

509.8
999.2
1468.2
1937.2
509.8 999.2 1468.2
1937.2


ZB200 Table of geometric characteristics of truss bridge(Half bridge)
structure geometric characteristics
geometric characteristics chord area(cm2)

Section

properties(cm3)

Moment of

inertia(cm4)

SS

single-row,

single-layer

SS single-row,single-layer 25.48 5437 580174

SSR single-row,single-layer,

reinforce

50.96
10875 1160348

DS

double-row,

single-layer

DS double-row,single-layer 50.96 10875 1160348
DSR1

double-row,single-layer,

reinforced

76.44 16312 1740522
DSR2

double-row,single-layer,

reinforced only on the top

101.92 21750 2320696

TS

triple-row,

single-layer

TS triple-row,single-layer 76.44 16312 1740522
TSR2

triple-row,single-layer,

reinforced only on the top

127.4 27185 2900870
TSR3

triple-row,single-layer,

reinforced only at the bottom

152.88 32625 3481044
QS

quadruple-row,

single-layer

QS quadruple-row,single-layer 101.92 21750 2320696
QSR3

quadruple-row,single-layer,

reinforced only on the top

178.36 38059 4061218
QSR4

quadruple-row,single-layer,

reinforced only at the bottom

203.84 43500 4641392

                                        

                                                       Wide range of application

                                                --------------------------------------▶▶▶--------------------------------------

55

                     Partial Cooperation Case Display

                                                    --------------------------------------▶▶▶--------------------------------------

 Company's production was exported tomany countries,such as   Nigeria.Angla,Congo,Cambodia,Nepal,Venezuela,Vietnam,Philppines,Bangladesh,Laos,Papua New Guinea   and so on.

Kamchay hydropower station in Cambodia  

KAMCHAY (Cambodia) hydropower station the provincial governor of Kampot and the military andgovernment officials attending the ribbon-cutting ceremony for the bridge's being open to traffic.

2

3

Cambodia

4

Cambodia

6

Cambodia

5

Cambodia

7

Cambodia

Project: Access Bridge for Kamchay Hydropower Station, Cambodia


Project Background:

The Kamchay Hydropower Station in Kampot province is a national-level energy project of great importance to Cambodia. During its construction and for its subsequent long-term operation, a permanent bridge capable of handling heavy equipment and vehicles was essential to cross the river, connecting the dam site to the main road network. The steel bridge we provided serves as a critical piece of this vital infrastructure.


Bridge Solution & Highlights:


Permanent Multi-Span Structure: A key feature of this project is its multi-span design. As the photos illustrate, our steel truss superstructure is installed upon a series of permanent, reinforced concrete piers. This "composite" or "hybrid" approach is highly effective, combining the durability and strength of a concrete substructure with the key advantages of a Bailey-type superstructure—namely, rapid and lightweight installation. This is a common and efficient design for major engineering projects.


Serving a National-Level Project: As the main access route for a major hydropower plant, the bridge was engineered to meet the stringent demands of long-term, high-intensity use, ensuring safe passage for construction traffic and operational maintenance vehicles.


Social Significance: Completed around December 2008, the project's importance is highlighted by the large-scale inauguration ceremony shown in the photos, attended by officials and the local community. This bridge not only enabled the successful construction and operation of the power station but also significantly improved local transportation, becoming a permanent and beneficial piece of public infrastructure.


Project Significance:

This project, dating back to 2008, demonstrates our company's long-standing experience in serving major international energy and infrastructure developments. It proves our products can be seamlessly integrated into permanent engineering works, offering clients a solution that is economical, time-efficient, and durable through the effective use of a steel superstructure on a concrete substructure.


                                          Our Advantage:

                       Advanced Equipment:Welding robots

                                 --------------------------------------▶▶▶--------------------------------------

1

    Raw Material

2

        Sawing

3

        Cutting

4

       Shearing

5

        Bending

6

        Punching

7

         Drilling

8

         Welding

9

Surface Treatment

10

    Semi-finished            products

11

         Painting

12

Finished products

                                                       Development History

                                  --------------------------------------▶▶▶--------------------------------------

2006Year

The company was solemnlyestablished and participatedin the construction ofSichuan Niangyong and Banduo HydropowerProjects in the same year.

2007Year Shanghai ConstruetionEngineering BeicaiMunicipal (overnment andTaizhou River CrossingBridge.

2008Year

The Ministry of Foreign Tradewas established,CambodiaGianzai Hydropower Station

and the domesticShanwei-Xiamen-ShenzhenRailway.

2009Year Participated in the elevatesupport of the ShanghaiJiangong Shangnan RoadInterchange at the WorldExpo and the GuoyangLaozi Temple LandscapeBridge in Anhui.
2010Year Participation in the construetion of Cambodia's Elezhai Hydropower Station and Stenwodai HydropowerStation and the steel bridge projeet of Oinghai XunhuaHydropower System.

2011Year

The Wenchuan Earth quakeassisted in the construetion of the export of steelbridges to lrag.
   2012Year Henan Zhengzhou FoxconnTraffie Bridge, Sichuan XixiheHydropower Station LhasaBangduo Hydropower StationSteel Bridge Proieet. ete.
   2013Year Angola and OuterMongolia steel bridge export tasks and Xiningand Tianjin steel bridge projects.
   2014Year Philippine exports and the construction of Shangri-LaYunnan in Hotan, Xinjiang 67-meter pipeline bridge inFengxiang,Shanxi,and137-meter steel bridge inYancheng China Railway.
   2015Year Singapore Super Bere Bridge,Nepal,Guatemala.India Patel 180-meter bronze statue construction 225-meter steel bridge and other projects.
   2016Year Congo Golden Steel Bridge Export,Shanghai Baosteel Xinjiang Kanas ForestryBureau,Zhenjiang Wetland Park Steel Bridge Project,Sanya Hongtang Airport 10.000-pile Bere Tablet Project started.
   2017Year Changzhou Longhutang Metro Station Metro Line 2 Beirejia Steel BridgeProjeet in Zhaosu County,Atushi. Hemu County,Xinjiang,Bozhou, Anhui.
2018Year

The Philippines and NepalShangmaxiangdi Hydropower Station,andthe Hidalaya Third Bridge Steel Bridge Project in Bangladesh.

2019Year

Shandong China Railway16 steel bridges in Beitun,Xinjiang,Shihezi pipegallery bridge, Shantousupport,etc.,exported toIndonesia.

2020Year Sangyuanzi Bridge across theYellow River in Lanzhou.Gansu.Sichuan Road Bridge 200 type deck full-heightshear-resistant Beley Bridge,Xinjiang Horgos steel bridge project, Linzhi, Tibet,ete.
2021Year What will Jiangsu BeileSteel Bridge Co.,Ltd. look like in the future? Please look for ward to it.


Qualification Certificate

--------------------------------------▶▶▶--------------------------------------

20
21
22


23
25
55
24

Packing and shiping

--------------------------------------▶▶▶--------------------------------------

20
21
29
26
28
27

                                                                         

                                       Service flow

                                  --------------------------------------▶▶▶--------------------------------------

Customer Service Phone number of the Jiangsu Bailey Steel Bridge Co.,Ltd.
The customer service representative can provide you with professional advice and explicit explanation.
We can arrange for an excellent engineer to keep in close touch with you at all times to your exact requirements.
Our engineer can explain in detail how to use the products while providing you with the necessary service.
Our engineer will conduct a thorough inspection of the bridge products and any problem which arises in theprocess would be solved.
The feedback on your service information will get to our company's service center.
Jiangsu Bailey Steel Bridge will follow up your business on the online service platform to ensure your satisfaction.


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

                   Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
E-mail: overseas@jsbaileybridge.com
           sales1@jsbaileybridge.com
           techconsultant@jsbaileybridge.com
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy