| Availability: | |
|---|---|
| Quantity: | |
CB100(CB321)Bailey Bridge
BAILEY
Double-row double-layer reinforced structure: a solid commitment under heavy loads
"Double-row and double-layer reinforcement" is not just a technical description, but also a solemn commitment to load-bearing capacity. The ordinary single-row and single-layer Bailey bridge already possesses considerable load-bearing capacity, while the Compact 200, by adopting an enhanced structure with two layers of trusses and parallel double rows on both sides, greatly improves the overall rigidity, bending resistance, and shear resistance of the bridge.
Imagine a situation where a heavy excavator weighing tens of tons or a mining truck loaded with ore needs to cross a river smoothly. Ordinary temporary roads or simple bridges may not be able to withstand the load, posing a risk of overturning or collapsing. The double-layer structure of the Compact 200 acts like "reinforcing ribs" for bridges, while its dual-row design widens the load-bearing surface, effectively distributing concentrated loads. This enables it to handle the frequent travel of heavy equipment on construction sites, such as concrete pump trucks and tower crane components, with ease. It can also serve as a reliable transportation corridor in mines and large industrial projects, ensuring the continuity of production operations. Its reliable heavy-load capacity provides a safe and secure "flat-like" experience even in the harshest engineering environments.
Multi-scenario adaptability: from temporary bridges to permanent facilities
The flexibility of modular steel bridges is also reflected in their wide range of application scenarios. They are by no means limited to "temporary" use.
In the early stages of large-scale infrastructure construction, such as when highways or railways cross rivers or canyons, the Compact 200 can quickly set up construction bridges for the passage of engineering vehicles and personnel, clearing the way for the smooth progress of the main project. After the project is completed, it can be completely dismantled and transported to the next construction site for reuse, significantly reducing engineering costs and aligning with the concept of green construction.
In remote mountainous areas, mining regions, or emerging development zones, constructing permanent concrete bridges can be costly and time-consuming. In such cases, Compact 200 steel bridges, which have undergone professional anti-corrosion treatment (such as hot-dip galvanizing), can serve as an economical, rapid, and durable semi-permanent or permanent transportation solution. Their robust steel structure can withstand the erosion of wind and rain, as well as certain levels of natural disaster impacts, ensuring a service life of several decades.
More importantly, in special fields such as military logistical support and field scientific expeditions, this capability of rapid deployment and bridge-building without relying on complex logistics holds irreplaceable strategic value. It can swiftly establish reliable transportation lines on unfamiliar terrain, ensuring the mobility of personnel and equipment.
The value of connection beyond tools
Therefore, the Compact 200 double-row and double-layer reinforced Bailey bridge is more than just an engineering tool. On the ruins left behind after floods and earthquakes, it serves as a "bridge of hope" that supports lifelines; on busy construction sites and mines, it acts as a "bridge of efficiency" that bolsters economic development; in remote villages and border areas, it functions as a "bridge of people's livelihood" that connects to the outside world and delivers benefits.
Its value lies in the perfect combination of the ultimate efficiency brought by modularization and standardization with the absolute reliability imparted by reinforced structures. Behind every scenario requiring rapid response and heavy-duty traffic, there stands such a silent yet powerful steel system, ensuring the unceasing flow of traffic arteries with its precise engagement and solid support.

Overview
--------------------------------------▶▶▶--------------------------------------
Product Details
Standard: ASTM, BS, GB Grade: Q345B-Q460C
Place of Origin: Jiangsu, China Brand Name: BAILEY
MOQ: 1 PC Delivery Time: 15-21 days
Application: Steel Structure Bridge Packing: 40' standard HQ containers
supply Ability: 10000.0 Ton/Tons per Year
Payment: L/C, T/T, ESCROW
Port of Loading: Any port of China, main port is Shanghai port
| ZB321(100) truss press limited table | |||||||||
| No. | internal force | structure form | |||||||
| not reinforced model | reinforced model | ||||||||
| SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
| 321(100) | standard truss moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375.0 | 4809.4 | 6750.0 |
| 321(100) | standard truss shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
| 321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
| Type No. | Geometric characteristics | structure form | |||||||
| not reinforced model | reinforced model | ||||||||
| SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
| 321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
| 321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
Product Projects
--------------------------------------▶▶▶--------------------------------------
Company's products are cxported to many countries, such as Singapore,India,Malaysia Nigeria,Angola, Congo, Cambodia, Nepal, Bangladesh, Vietnam, Venezucla, papua cuinen and ouicountries.
Philippines
Type-321 bridge,75m long,DSR (double-row,single-layer,reinforced) Mindoro province, Philippines.
Philippines
Philippines
Myanmar
Bailey bridge,144m long,load 20 tons in Myanmar.
Bailey bridge exported to Myanmar government, 108 sets(2000t, galvanized)
Myanmar
Myanmar
Myanmar
Myanmar
Kenya
Thika Nairobi, Kenya type200 t,his bridge is used for United Nations Peacekeeping.
Kenya
Kenya
Product Process
--------------------------------------▶▶▶--------------------------------------
①
Raw Material
②
Sawing
③
Cutting
④
Shearing
⑤
Bending
⑥
Punching
⑦
Drilling
⑧
Welding
⑨
Surface Treatment
⑩
Semi-finished products
⑪
Painting
⑫
Finished products
International Vision
--------------------------------------▶▶▶--------------------------------------
| 2006Year | The company was solemnlyestablished and participatedin the construction ofSichuan Niangyong and Banduo HydropowerProjects in the same year. |
| 2007Year | Shanghai ConstruetionEngineering BeicaiMunicipal (overnment andTaizhou River CrossingBridge. |
2008Year | The Ministry of Foreign Tradewas established,CambodiaGianzai Hydropower Station and the domesticShanwei-Xiamen-ShenzhenRailway. |
| 2009Year | Participated in the elevatesupport of the ShanghaiJiangong Shangnan RoadInterchange at the WorldExpo and the GuoyangLaozi Temple LandscapeBridge in Anhui. |
| 2010Year | Participation in the construetion of Cambodia's Elezhai Hydropower Station and Stenwodai HydropowerStation and the steel bridge projeet of Oinghai XunhuaHydropower System. |
2011Year | The Wenchuan Earth quakeassisted in the construetion of the export of steelbridges to lrag. |
| 2012Year | Henan Zhengzhou FoxconnTraffie Bridge, Sichuan XixiheHydropower Station LhasaBangduo Hydropower StationSteel Bridge Proieet. ete. |
| 2013Year | Angola and OuterMongolia steel bridge export tasks and Xiningand Tianjin steel bridge projects. |
| 2014Year | Philippine exports and the construction of Shangri-LaYunnan in Hotan, Xinjiang 67-meter pipeline bridge inFengxiang,Shanxi,and137-meter steel bridge inYancheng China Railway. |
| 2015Year | Singapore Super Bere Bridge,Nepal,Guatemala.India Patel 180-meter bronze statue construction 225-meter steel bridge and other projects. |
| 2016Year | Congo Golden Steel Bridge Export,Shanghai Baosteel Xinjiang Kanas ForestryBureau,Zhenjiang Wetland Park Steel Bridge Project,Sanya Hongtang Airport 10.000-pile Bere Tablet Project started. |
| 2017Year | Changzhou Longhutang Metro Station Metro Line 2 Beirejia Steel BridgeProjeet in Zhaosu County,Atushi. Hemu County,Xinjiang,Bozhou, Anhui. |
| 2018Year | The Philippines and NepalShangmaxiangdi Hydropower Station, andthe Hidalaya Third BridgeSteel Bridge Project in Bangladesh. |
| 2019Year | Shandong China Railway16 steel bridges in Beitun,Xinjiang, Shihezi pipegallery bridge, Shantousupport,etc.,exported toIndonesia. |
| 2020Year | Sangyuanzi Bridge across theYellow River in Lanzhou.Gansu.Sichuan Road Bridge200 type deck full-heightshear-resistant Beley Bridge,Xinjiang Horgos steel bridgeproject, Linzhi, Tibet, ete. |
| 2021Year | What will Jiangsu BeileSteel Bridge Co.. Ltd. looklike in the future? Pleaselook forward to it. |
Qualification Certificate
--------------------------------------▶▶▶--------------------------------------
Warehousing and shiping
--------------------------------------▶▶▶--------------------------------------
Service flow
--------------------------------------▶▶▶--------------------------------------
![]() | Customer Service Phone number of the Jiangsu Bailey Steel Bridge Co.,Ltd. |
![]() | The customer service representative can provide you with professional advice and explicit explanation. |
![]() | We can arrange for an excellent engineer to keep in close touch with you at all times to your exact requirements. |
![]() | Our engineer can explain in detail how to use the products while providing you with the necessary service. |
![]() | Our engineer will conduct a thorough inspection of the bridge products and any problem which arises in theprocess would be solved. |
![]() | The feedback on your service information will get to our company's service center. |
![]() | Jiangsu Bailey Steel Bridge will follow up your business on the online service platform to ensure your satisfaction. |
FAQ
--------------------------------------▶▶▶--------------------------------------
![]() | What kind of company are you? |
| ☺ | We are a specialized steel bailey bridge manufacturer with leading manufacturing process for steel bailey bridges in China, who has engaged in this line for over 20 years with an international Quality System Certification of ISO9001:2015 and as cooperation partner with the research institutions of the People's Liberation Army. In addition to this, have good market reputation overseas, like Nigera, Angola, Cango, Cambodia, Nepal, Venezuela, Vietnam, Bangladesh, Papua new guinea, Columbia...... |
![]() | Are you a factory or a trade company ? |
| ☺ | We are a factory with Six production lines and various machines to fabricate steel bridges parts and other steel structures. Also, we have gotten the exporting license to devote ourselves into global markets. |
![]() | How about quality control of your company? |
| ☺ | We pay great attention on quality control from the beginning to the end,keeping our goods to meet the standards of CMA,CNAS,ISO9001,Grade I road,Grade A urban road,Amercia loading standard HS25 and British loading standard HA. |
![]() | Where is your loading port? |
| ☺ | Any port in China, the main port is Shanghai port . |