Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 321 Bailey Bridge / Compact 321 / Factory Sale Price of Bailey Bridge Steel Emergency Bridge China Manufacturer Pedestrian Bridge

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Factory Sale Price of Bailey Bridge Steel Emergency Bridge China Manufacturer Pedestrian Bridge

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • CB100(CB321)Bailey Bridge

  • BAILEY

Overview

we can also help you to sove any subsequent bailey bridge component maintenance.

About Bailey bridge

Bailey bridge is used when there is a need to cross an obstaclefor a certain time period. During or after natural disastersreplacement or renovation of consistent bridges or in unusualareas like the movie industry. Thereby the function also differs fordifferent users of the bridge which could be pedestrians,common vehicles(cars, busses, trucks), heavy militarystyle equipment (tank), or the railway.


Standard:                    ASTM, BS, GB                                                                        Grade:                   Q345B-Q460C

Place of Origin:          Jiangsu, China                                                                       Brand Name:        BAILEY

Model Number:         JSBLGQ-HD200-071                                                              Type:                     Heavy

Packing:                      40' standard HQ containers                                                  Tolerance:             ±3%

MOQ:                          1 PC

Product Name:           Hot sale 200 style treastle bailey bridge Hot-Sell

Port of Loading:         Any port of China, main port is Shanghai port

                  SS

           Single Row Single Layer

            Length: 21.336m

            Width: 4.2m

            Whether reinforced: no





19



Project Showcase:

 An Extreme 120-Ton Capacity Deck-Type Bridge on the Duku Highway

Duku Highway

Duku Highway

Duku Highway


Project Vitals:

Client: Water Conservancy and Hydropower Engineering Bureau of Xinjiang Production and Construction Corps

Location: Dushanzi-Kuqa (Duku) Highway, Xinjiang, China

Span Length: 30 meters (approx. 98 feet)

Configuration: Deck-Type, 9-Row, Single-Layer

Application: Extreme Heavy-Load, Semi-Permanent Bridge


An Elite Bridging Solution for China's Most Epic Highway:

This project provided a critical crossing on the legendary Duku Highway, a route renowned for its breathtaking scenery and perilous, high-altitude terrain. Commissioned by a government engineering authority, the bridge required an extraordinary load capacity to support special heavy vehicles in one of China's most challenging environments.


Engineering Highlights & A Custom Heavy-Duty Design:

Extreme 120-Ton Load Capacity: To handle the immense 120-ton load requirement, a highly specialized deck-type, 9-row, single-layer configuration was engineered. In this design, nine parallel lines of Type 321 trusses are arrayed side-by-side directly beneath the roadway, creating a high-density foundation to support the 30-meter span.


Integrated Steel Substructure: The prefabricated superstructure is supported by a robust substructure of 630mm diameter spiral steel pipe piers. This all-steel, hybrid design allows for rapid installation, a significant advantage in remote mountain locations with short construction windows.


Heavy-Duty, Maintenance-Free Deck: The bridge is surfaced with specialized heavy-duty deck panels featuring a maintenance-free design. This was a crucial requirement to ensure long-term reliability and reduce the lifecycle cost of the structure in a location where access for maintenance is difficult.


Specialized Heavy-Vehicle Carriageway: The bridge provides a 4.2-meter wide carriageway, engineered specifically to provide safe passage for oversized and extreme-load vehicles essential for the region's development and upkeep.


A Benchmark for Extreme-Load Prefabricated Bridges:

The Duku Highway project is a testament to our ability to deliver highly customized, creative solutions for the most demanding infrastructure challenges. It showcases how our modular systems can be configured into ultra-high-strength platforms, providing vital support for national projects in the world's most formidable terrains.


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

                   Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
E-mail: overseas@jsbaileybridge.com
           sales1@jsbaileybridge.com
           techconsultant@jsbaileybridge.com
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy