Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 321 Bailey Bridge / Compact 321 / Long Life-service Prefabricated Bailey Steel Construction Bridge

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Long Life-service Prefabricated Bailey Steel Construction Bridge

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • Compact 321

  • BAILEY

The dam of the Nepal Sinohydro Bureau 7 Manang Marsyangdi Hydropower Station is approximately 223 km from Kathmandu. It is approx 163 km from Kathmandu to Besisahar town, basically asphalt pavement, two-way, 2-lane. From Besisahar town to the Manang Marsyangdi Hydropower Station Dam is approx 60 km, which is the Annapurna Circuit tourism road, serving as the project access road. It is mainly gravel pavement, with some sections being concrete pavement, and must bear the transportation tasks for equipment, materials, etc., required by the Manang Marsyangdi project.


The Bailey Bridge is located approximately 150m downstream of Construction Adit 1#, spanning the Manang Marsyangdi River. The right bank connects to Road 2-1#, and the left bank connects to Road 3-1#. This bridge is the main route for transporting hydropower station equipment and materials and will undertake the traffic support work throughout the entire construction process of the hydropower station.


The Bailey Bridge is Type 200,a single span with a full length of 30.48m, and is a standard Double-Row, Single-Story, Reinforcedsteel truss bridge. It arrived on-site in October 2024. Due to being in the mountainous region of Nepal, large-scale equipmentcould not access the site. The steel bridge construction had to overcome limitations of construction length, meticulouslydesigning the construction and counterweight plan. Finally, through everyone's concerted cooperation, the steel bridge erectionwas completed within 7 days, allowing the access traffic to open smoothly ahead of schedule, creating a very good situation forthe next phase of the hydropower station's project construction.

Nepal

Nepal

Nepal

Nepal


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy