Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 321 Bailey Bridge / Compact 321 / Successfully delivered and erected a CB200 Bailey Bridge project in Malaysia

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Successfully delivered and erected a CB200 Bailey Bridge project in Malaysia

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • Compact 321

  • BAILEY

CB200 Modular Bailey Bridge in Malaysia


Project Overview:

We have successfully delivered and erected a CB200 Bailey Bridge project in Malaysia. This project perfectly demonstrates the exceptional adaptability, modularity, and rapid assembly capabilities of our steel bridge systems under dynamic site conditions.

7

Malaysia

2-1

Malaysia

8

Malaysia

1

Malaysia



Design vs. Actual Implementation:


   Original Design: Two independent 39.624m single-span bridges utilizing a Triple-Row Single-Layer Reinforced (TSR) configuration.


   Optimized On-Site Solution: To better accommodate the actual topographical constraints during installation, the structure was swiftly adapted into a continuous three-span bridge. The final layout consists of a 27.432m span (9 bays) + 36.576m span (12 bays) + 27.432m span (9 bays), utilizing a Double-Row Single-Layer Reinforced (DSR) configuration.


Key Highlights:


   High Versatility: The seamless transition from the original TSR single-span design to a multi-span DSR layout highlights the structural flexibility of the CB200 Bailey Bridge, allowing for rapid on-site design modifications.


   Maximum Durability: The entire bridge structure underwent hot-dip galvanization, providing superior anti-corrosion performance and ensuring a prolonged service life, even in harsh tropical climates.


   Efficient Erection: Assembled and launched by trained, skilled personnel, the installation was highly efficient. The bridge is now fully operational and smoothly opened to traffic.


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy