CB200 Modular Bailey Bridge in Malaysia
Project Overview:
We have successfully delivered and erected a CB200 Bailey Bridge project in Malaysia. This project perfectly demonstrates the exceptional adaptability, modularity, and rapid assembly capabilities of our steel bridge systems under dynamic site conditions.
Malaysia
Malaysia
Malaysia
Malaysia
Design vs. Actual Implementation:
Original Design: Two independent 39.624m single-span bridges utilizing a Triple-Row Single-Layer Reinforced (TSR) configuration.
Optimized On-Site Solution: To better accommodate the actual topographical constraints during installation, the structure was swiftly adapted into a continuous three-span bridge. The final layout consists of a 27.432m span (9 bays) + 36.576m span (12 bays) + 27.432m span (9 bays), utilizing a Double-Row Single-Layer Reinforced (DSR) configuration.
Key Highlights:
High Versatility: The seamless transition from the original TSR single-span design to a multi-span DSR layout highlights the structural flexibility of the CB200 Bailey Bridge, allowing for rapid on-site design modifications.
Maximum Durability: The entire bridge structure underwent hot-dip galvanization, providing superior anti-corrosion performance and ensuring a prolonged service life, even in harsh tropical climates.
Efficient Erection: Assembled and launched by trained, skilled personnel, the installation was highly efficient. The bridge is now fully operational and smoothly opened to traffic.