Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 200 Bailey Bridge / Compact 200 / truss temporary bridge steel bridge structures

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

truss temporary bridge steel bridge structures

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • Compact 200

  • BAILEY

The CB200 Bailey Bridge is a bridge equipment widely used in military and civilian fields, characterized by simple structure, convenient portability, and fast installation speed. Mainly used for quickly erecting temporary bridges in complex terrains such as rivers, lakes, and swamps to ensure the smooth passage of personnel and materials.

The CB200 Bailey Bridge mainly consists of the following parts: the Bailey Bridge is composed of three layers: upper, middle, and lower. The upper layer is the bearing layer, the middle layer is the supporting layer, and the lower layer is the base. The foot of the bridge is the part where the Bailey Bridge comes into contact with the ground and serves to support and stabilize the bridge. Bridge accessories include bridge connectors, fasteners, etc., used to connect the bridge and the bridge foot, ensuring the overall stability of the bridge.

For more information or inquiries, please contact us.

                                       Core Advantages

                                               --------------------------------------▶▶▶--------------------------------------

6

Careful selection of materials

5

Rigorous Craftsmanship

3

Quality Assurance

1

Integrity management

4

Technical team

2

After-sales service


Preparation before construction

                               --------------------------------------------▶▶▶---------------------------------------------

Environmental assessment

Conduct a detailed environmental assessment before construction, including investigation of surrounding vegetation, water bodies, wildlife habitats, etc., and develop corresponding ecological protection plans.

Reasonable site selection: 

Choose the construction site with the least impact on the ecological environment, and avoid construction in ecologically sensitive areas or nature reserves.


 Load desiqn of Bailey Steel Bridge

                                   --------------------------------------▶▶▶--------------------------------------

Type Type 321 Bridge Form 6row,deck-type,single layer
Length 162m Load 3.5kN/m2
Net width 5m Anticorrosive Anticorrosive paint
Service Life Semi-permanent steel structure


                                Product  Parameters

                                                    --------------------------------------▶▶▶--------------------------------------

162 meter pedestrian landscape bridge in Yangpi Lake Wetland Park, Fuyang District, Hangzhou City, Zhejiang Province

Yangpi Lake Wetland Park, Hangzhou City, Zhejiang Province  

800_01800_02800_03800_04




Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

                   Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
E-mail: overseas@jsbaileybridge.com
           sales1@jsbaileybridge.com
           techconsultant@jsbaileybridge.com
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy