Tel: +86 15262904857    E-mail: overseas@jsbaileybridge.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Custom Bridge / Pedestrian Bridge / Bailey Bridge Pedestrian Bridge Structure Low Cost Factory Supply Truss Bridge

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Bailey Bridge Pedestrian Bridge Structure Low Cost Factory Supply Truss Bridge

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • CB100(CB321)Bailey Bridge

  • BAILEY

Project: 75-meter Heavy-Duty 321-Type Bailey Bridge in Mindoro, Philippines.

Philippines

Philippines

Philippines



Project Background:

This project is located in Mindoro province, Philippines. Due to local geographical challenges or the aging of existing infrastructure, there was an urgent need for a durable, high-capacity bridge that could be rapidly deployed. The primary goal was to ensure the smooth transportation of heavy materials, such as mineral resources or construction aggregates, to support the region's economic activities. Our solution was selected for its efficiency and proven reliability.


Bridge Solution & Highlights:

Bridge Model: We utilized the universally adopted 321-Type Bailey panels. This is a mature, standardized system with fully interchangeable components, which significantly enhances the speed of assembly.


Structural Design: The bridge spans a total length of 75 meters and was configured as a "Double-Row, Single-Story, Reinforced" (DSR) structure. This design, featuring two rows of panels on each side of the bridge, substantially increases its overall stiffness and load-bearing capacity, making it specifically suited for heavy vehicle traffic. The images of fully loaded dump trucks successfully crossing the bridge are a clear testament to its superior performance.


Project Execution: We provided a comprehensive service package, covering manufacturing, shipment, and on-site installation guidance. The modular nature of the Bailey bridge allowed for a swift assembly process on-site with minimal need for specialized heavy machinery, greatly reducing the overall construction time. The bridge was successfully commissioned in January 2014, effectively addressing the client's urgent requirement.


Project Significance:

This Mindoro bridge project serves as a classic example of our success in the Philippine and broader Southeast Asian markets. It not only highlights the outstanding performance and reliability of our 321-Type Bailey Bridge products but also demonstrates our capability in delivering customized bridging solutions and managing overseas projects effectively.


Previous: 
Next: 
CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

                   Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
E-mail: overseas@jsbaileybridge.com
           sales1@jsbaileybridge.com
           techconsultant@jsbaileybridge.com
FAX:  +86-511-88881212
QQ:  2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy