| Availability: | |
|---|---|
| Quantity: | |
Compact 200
BAILEY
Wind farm development often occurs in remote locations with limited existing infrastructure. Transporting large wind turbine components, including blades, nacelles, and towers, requires stable, temporary crossing solutions that can handle heavy loads. The 120 ton 200 series bailey bridge provides a modular, rapidly deployable crossing system designed specifically for wind farm equipment transport operations.
The 200 series bailey bridge uses a panel-based construction system that allows for assembly without specialized heavy equipment. Standardized components can be transported using conventional trucks and assembled by a small crew. This design reduces on-site construction time compared to permanent bridge structures.
Engineered to support heavy vehicle loads up to 120 tons, this bridge configuration accommodates the specialized transport vehicles used for wind turbine components. The design distributes weight evenly across the bridge structure, ensuring stability during transit of oversized and heavy loads.
The bridge can be configured to span different lengths based on project requirements. It can be installed over streams, ditches, and uneven terrain commonly found in wind farm locations. Foundation requirements are minimal, making it suitable for temporary use in remote areas.
| | |
The bridge provides a stable crossing for the long, low-bed trailers used to transport wind turbine blades. Its design allows for the wide turning radii required by these specialized vehicles.
Nacelles and tower sections represent some of the heaviest components in wind farm construction. The 120 ton capacity ensures safe passage for these loads, even when combined with the weight of the transport vehicle.
In addition to turbine components, the bridge supports access for construction equipment, including cranes, excavators, and concrete mixers, throughout the wind farm development process.
Parameter | Value |
Load Capacity | 120 tons |
Series | 200 |
Standard Panel Dimensions | 3.048 m × 2.134 m |
Maximum Single Span | 60.96 m |
Deck Width | 4.2 m |
Material | High-strength structural steel |
Surface Treatment | Hot-dip galvanized |
Design Life (Temporary Use) | 10 years |
Assembly Method | Bolted connection |
Site preparation and foundation installation
Assembly of bridge panels and transoms
Installation of decking and safety features
Load testing and inspection before use
Regular inspections should be conducted to check for loose bolts, corrosion, and structural damage. Minor repairs can be performed on-site using standard tools. Replacement components are available for all parts of the bridge system.
The maximum single span length is 60.96 meters. Longer spans can be achieved using intermediate supports.
A 30-meter span can typically be assembled by a 6-8 person crew in 3-5 days, depending on site conditions.
Yes, the modular design allows for disassembly and reuse on subsequent wind farm or industrial construction projects.
Suitable foundation options include concrete footings, steel piles, and timber cribbing, depending on soil conditions and project duration.
The 120 ton 200 series bailey bridge offers a practical solution for wind farm equipment transport challenges. Its modular design, high load capacity, and adaptability to remote site conditions make it a valuable asset for industrial construction projects. For customized bridge configurations and engineering support, contact our technical team to discuss your specific project requirements.